Wolfgang Dudler's Blog

home

blog August 07 September 07 October 07 November 07 December 07

Jan 08 Feb 08 Mar 08 Apr 08 May 08 June 08 July 08 Aug 08 Sep 08 Oct 08 Nov 08 Dec 08

Jan 09 Feb 09 Mar 09 Apr 09 May 09 Jun 09 July 09 Aug 09 Sep 09 Oct 09 Nov 09 Dec 09

Jan 10 Feb 10 Mar 10 Apr 10 May 10 Jun 10 July 10 Aug 10 Sep 10 Oct 10 Nov 10 Dec 10

newer

Sep 30

The second structure for the scrap yard at Diamond Valley was build.

This hangar has a wooden core with polystyrene sheets.

 

5631


Sep 22

Here's a first set up at Diamond Valley.

You see the structure without loading ramp. This will be the next step. And a picture from the back side. This side will see the train crews when they walk along the outside of Diamond Valley.

 


5581

5582
5580


Sep 21

Working at the Bagel Bakery.

And running some trains.

And this is the picture to the video at YouTube

5578


Sep 19

Today I've started with scrap loads for the scrap yard.

And I painted the window frames.

 

55735575


Sep 18

I decided to use this structure also for my Plywood District bakery. Therefore I added more walls to get some depth.

This second part goes to the background.

 

55705571


Sep 16

Now I've started building the bakery for Diamond Valley. I used DPM KIT # 103, Cutting's Scissor Co.
I've arranged the walls in another way than in the instructions. I cut a few walls. This way I got a longer building. The back wall - at the module border - will be a piece of plywood. Plywood was the choise for the top roof too.

I spray painted the structure with redbrown. The other day I filled the brick lines with very thin gray color.

 

5565

55678
5568


top          

© Wolfgang Dudler