Wolfgang Dudler


 

PUEBLO & SALT LAKE RR

 

  to  home   


To get soon a running railroad I came to another idea. For the first time I can incorporate my town Salina and staging yard Fiddletown. This way I can run trans and do some scenery at Esperanza and Cameo Canyon.

temp

Benjamin built the first segments for the benchwork.

4157 4156

And the first two segments have got legs...

41694170

and the finished frame

Staging yard Pueblo / Salt Lake City
4201
future Cameo Canyon
4203
Esperanza
4204
Esperanza
4205
Gluing cork road bed
4208
Testing track and turnout position
4207

More work with benchwork. Esperanza needs the cork roadbed still.

The first Tortoise and BluePoint.
4213
I use 1.0mm wire instead of 0.8mm.
4214
Esperanza with the narrow gauge line.
4216

More track work

The first staging loop is finished with trackwork
4242
But still without any wiring
4243
The track gang comes to Esperanza
4244

The track gang was busy and arrived Esperanza. They also wired one staging track.

42604261

And the first test train!

The train arrives Esperanza

42834283

... and testing the crossing.

4295 4308

                                                              top                 


© Wolfgang Dudler